Light is a HUMAN right.

PLANNING

Upon completing an Energy Necessity Assessment (ENA), which involves a thorough analysis of the region’s specific energy demands, infrastructure limitations, and environmental conditions, we move forward with a Detailed Implementation Plan (DIP). This plan is tailored to address the unique needs of the area, ensuring that the microgrid system complements both the existing power infrastructure and the local environment.

DEPLOYMENT

After finalizing the Detailed Implementation Plan (DIP), we move into the Construction and Deployment (C&D) phase. This stage begins with site preparation, including securing permits and clearing the land. We then install renewable energy systems like solar panels and battery storage to ensure continuous power. A smart energy management system is integrated for optimal performance, whether the microgrid is connected to or independent of the main grid. Rigorous testing follows to ensure safety and reliability. Ongoing monitoring and maintenance keep the microgrid running efficiently over the long term.